Summary
Overview
Work History
Education
Skills
Projects
DECLARATION
Timeline
Generic
Vamshikrishna Pitta

Vamshikrishna Pitta

To be a part in a talented organization of repute wherein I can execute challenging assignments for achieving new heights of success with commitment and leaving a mark of excellence on each step.
Hyderabad

Summary

A competent professional with 10+ years of experience in Control Systems with PLC SCADA and DCS better understanding in P&ID with Mark Vie ToolboxST hands on in Control logic development for execution of GE Control Alliance New Unit projects along with services jobs upgrades to meet client requirements.

Overview

10
10
years of professional experience

Work History

Project Controls Engineer

Tata Consultancy Service Ltd
02.2025 - Current
  • Provided technical support for clients during system installation, troubleshooting, and maintenance activities.
  • Developed custom HMI interfaces for improved user experience and ease of operation within complex control systems.
  • Reduced project completion time through effective communication and collaboration among cross-functional teams.
  • Provided technical support to external and internal customers.
  • Improved SCADA system reliability by conducting regular maintenance and implementing software updates.
  • Reduced downtime and increased productivity by troubleshooting and resolving SCADA system issues swiftly.
  • Read blueprints, wiring diagrams, schematic drawings and engineering instructions to properly assemble electronics units.

Senior Control Engineer

Quest Global India Pvt Ltd
12.2021 - 02.2025
  • Maintaining high billable hours, On-time completion with quality execution of work
  • GT Controls Software modification, designing and Validation as per scope using ToolboxST.
  • Kick-off meeting with various customers to understand the scope of design and conduct PRR for the project.
  • Performed DDR & DVR after RQM simulations for every project as a quality assessment to ensure quality deliverable.
  • Site Coordination and lessons learnt during project execution are discussed with principal engineer, identified and updated the process gap that needs to be followed.
  • Analyze and identify the risk items which are deviated from GE standards for process improvement.

Senior Automation Engineer

BHAVANEE AUTOMATION SOLUTIONS
05.2017 - 08.2021
  • Preparing GA drawings, power and control wiring drawings by AutoCAD software.
  • Following up with required modifications in designs according to the customer requirement till the drawing’s approval, based on the approval giving mfg clearance to supplier and follow-up for the material readiness as per the P.O delivery schedule.
  • Coordinating with project engineers and clients for necessary correspondence and involving into project execution meetings with project management team.
  • Experience in logic design and configuration for various process control and automatic testing machines includes the design field.
  • Leading projects from planning to installation and commissioning stage.
  • Selection of PLCs, drives, HMIs, and other field instruments as per the project specifications.
  • Designing, development, and implementation of application software and hardware configurations for PLC, HMI, SCADA, and field instruments.
  • Establishing the networking and communication between various systems in the project.
  • Identify all technical issues of assigned projects to assure complete customer satisfaction.
  • I have handling customer services, improving customer relations and make satisfied to customers.
  • Good Communication skills and co-operative with my team members.
  • Developed custom automation software, streamlining processes and saving time on manual tasks.

Automation Engineer

SRS AUTOMATION
07.2015 - 05.2017
  • Leveraged strong programming skills to develop custom scripts for PLCs, HMIs, and other control system components used in automated machines.
  • Reduced downtime due to equipment failures by implementing predictive maintenance strategies based on data analysis.
  • Developed custom software solutions for various automation projects, improving system functionality and end-user experience.
  • Preparing I/O List, Control Circuits.
  • Attending service calls
  • Managed documentation efforts related to the design, installation, and operation of automated systems, ensuring accurate records were maintained for future reference.

Education

M-Tech - Electrical Power Systems

DARE Engineering College
Khammam
04.2001 -

Skills

    Ge Proficy iFiX

    Proficy CIMPLICITY

    GE Historian

    GE Versamax, and PAC series PLC’s

    Allen Bradly PLC

    Siemens PLC

    GE makes Distributed Control System (DCS) Mark Vie Gas turbine control system and Tool Box ST

    MS SQL and MySQL

    Modbus (RTU & TCP/IP), OPC (UA/DA), HART, and gateways such as IGS and Kepserver

    VB Script

    CLM

    PLM

Projects

  • New Unit (9F.03 Mostaganem ).
  • New Unit (9F.03 Kais).
  • New Unit (7F.05 Ghazlan SEC).
  • Services(After market jobs implemented and Support Customer Outages NOFD)
  • Developed and Commissioned iFIX SCADA (Server & Client architecture) for Energy Management System at DRL Biologics and Aurobindo Pharma Ltd using Kepserver, iFIX, and MS SQL.
  • Implemented Terminal Automation System at IOCL, Balasore in coordination with Endress + Hauser using RSTi-EP CPE100 PLC, iFIX, and MySQL.
  • Designed and Programmed Plant Safety System at HPCL Chennai and Hoshiarpur using Siemens S7-1200 PLC, GE Versamax PLC, iFIX, and EXOR HMI.
  • Commissioned Furnace LPG delivery system at Vennar Ceramics using GE Versamax PLC and EXOR HMI.
  • Developed Logic for Data sharing between HPCL, SA LPG, and GAIL at Visakhapatnam for OISD – 214 compliances.
  • Implemented system for Rocket Fuel processing using RSTi-EP CPE100PLC and iFIX at Fluid Energy Mill – VSSC, Kerala.
  • Commissioned numerous up-gradation projects at ISPRL, GAIL, AGI Glaspac, Fenoplast Ltd, GSH Group, and BPCL.
  • Implemented Water Monitoring System at Pfizer In, Visakhapatnam with iFIX SCADA.
  • Commissioned Fire Alarm and GAS Monitoring system, process operation HPCL LPG Terminal using Siemens Redundant PLC S7-400 PLC, iFIX SCADA.

DECLARATION

I hereby declare that the above furnished particulars are true to the best of my knowledge and belief.


Date: (PITTA VAMSHIKRISHNA )                          

Place: 

Timeline

Project Controls Engineer

Tata Consultancy Service Ltd
02.2025 - Current

Senior Control Engineer

Quest Global India Pvt Ltd
12.2021 - 02.2025

Senior Automation Engineer

BHAVANEE AUTOMATION SOLUTIONS
05.2017 - 08.2021

Automation Engineer

SRS AUTOMATION
07.2015 - 05.2017

M-Tech - Electrical Power Systems

DARE Engineering College
04.2001 -
Vamshikrishna PittaTo be a part in a talented organization of repute wherein I can execute challenging assignments for achieving new heights of success with commitment and leaving a mark of excellence on each step.