Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

R N DINAKAR PARIMI

Hyderabad

Summary

Experienced Mechanical Engineer with a strong background in production activities, specializing in manufacturing MS Spiral Pipes and HDPE/MDPE Pipes. Skilled in project management, including erection and commissioning, process and operations, as well as Laying and Guniting of MS Spiral Pipes. Knowledge in Fabrication of metal structures based on provided drawings, ensuring precision and adherence to specifications.

Overview

2025
2025
years of professional experience

Work History

Associate Manager – Production

Megha Engineering and Infrastructures Limited
2 2015 - Current
  • Managing all Production activities involving Manufacturing of Mild Steel Spiral Pipes from Raw Material (Hot Rolled Coil) to final product (Bare Pipe) in accordance with QAP standard
  • Ensuring production targets are met with Quality Standards within given time frame
  • Co-ordinate with Maintenance department in planning of Preventive maintenance schedule for Spiral Pipe Mill
  • Responsible in maintaining and improving quality of pipes by providing product related knowledge to Workmen at various stages involved as per process flow control
  • Prepare and Maintain daily production documents and SOPs
  • Carried out steel fabrication works as per given drawings
  • Plan and co-ordinate with QAQC at time of third party inspection or client Inspection
  • Collaborating with Maintenance Department for timely preventive maintenance works at spiral pipe mill
  • Preparing of IA audit reports, WPS,PQR & WPQ for welders qualification
  • Preparing monthly production data ,fabrication data , consumables data, scrap data
  • Co-ordinate and Facing Internal & External Audits from API 5L(Line Pipe), API Spec Q1, IS 3589(Pipe Manufacturing), ISO 9001:2015
  • Preparing the Monthly Material Consumption & Scrap details
  • Offering Pipe for Inspection at Every stages as per QAP

Senior Engineer, Production HDPE Pipe

Megha Engineering & Infrastructures Ltd
02.2015 - Current
  • Monitored Production of HDPE/MDPE Pipe Extrusion down streams ranging from 250kg/hr to 850kg/hr – Kabra Extrusion Technik Machinery
  • Co-ordinated with all shift in-charge activities for ensuring smooth production as per planning schedule
  • Prepared Production documents on Daily/Monthly basis as per Production Plan
  • Assisted with QA/QC team for Scheduling Inspection of Final Output Product HDPE/MDPE pipe.
  • Collaborated effectively in Manufacturing of MDPE - Gas Pipe Line starting from Production to Final Quality Inspection and Testing in adherence with QAP standard.
  • Developed Profound knowledge on Trouble shooting and Functioning of HDPE Material Conveying systems, Dosing/Mixing Units, Storage Hoppers, 110 TR MS Air-Cooled Chillers – Prasad Koch Technik Pvt Ltd
  • Regular Assistance with Maintenance department in preventive breakdowns and shut down operations related to plant machineries at shop floor
  • Additional responsibility for timely planning and co-ordination for dispatch of Final Product HDPE/MDPE pipes
  • Have Working experience in HDPE Plant Expansion - Erection and Commissioning Works.

Engineer, Production

Sri Bhavani Castings Limited
10.2012 - 04.2014
  • Responsible for daily production activities in Foundry Plant in manufacturing of Metal Casting products for Automotive components like Brake Drums, Spring Shackles, Spring Brackets, Crank Levers and Clutch Pressure Plates
  • Prepared daily/monthly Foundry Production and Rejection reports
  • Effectively followed Control Plan for Production processes in Foundry
  • Carried out Erection and Commissioning works of Automated Batch Sand Plant ( EIRICH INDIA LIMITED) and HPML Koyo Machine and executed production activities and trainings related to new project operations.

Graduate Engineer Mechanical, 4MW Thermal Power Plant

Shree Papers Limited
08.2010 - 02.2012
  • Supervised for the Operation of a 4MW Thermal Captive Power Plant
  • Assisted in Plant Maintenance and Shift In-charge activities by monitoring of Boiler Feed Pumps and preventing failure of Under Bed and Over Bed Feeding to the Boiler
  • Involved and responsible for preventive failing of Boiler Tubes functioning due to insufficient flow of water from Boiler Feed Pump
  • To upkeep plant supporting power generation equipment like 24 TPH Boiler,4MW Extraction cum Condensing Impulse type Steam Turbine, 2x125KW Boiler Feed Pumps, 55KW ID Fan,132KW FD Fan, 45KW PA Fan.

Education

B.Tech MECHANICAL ENGINEERING -

Regency Institute of Technology - Pondicherry UN
Kakinada
05.2009

Board of Intermediate Education M.P.C -

Aditya Public School
Kakinada
03.2005

Secondary School Certificate -

Aditya Public School
Kakinada
03.2003

Skills

    Operational Efficiency

    Technical knowledge

    Equipment Operation

    Continuous improvements

    Shifts Scheduling

    Production Scheduling

    Mechanical specifications

    Teamwork and Collaboration

    Industrial safety

Languages

English
Upper intermediate (B2)
Hindi
Advanced (C1)
Telugu
Bilingual or Proficient (C2)

Timeline

Senior Engineer, Production HDPE Pipe

Megha Engineering & Infrastructures Ltd
02.2015 - Current

Engineer, Production

Sri Bhavani Castings Limited
10.2012 - 04.2014

Graduate Engineer Mechanical, 4MW Thermal Power Plant

Shree Papers Limited
08.2010 - 02.2012

Associate Manager – Production

Megha Engineering and Infrastructures Limited
2 2015 - Current

B.Tech MECHANICAL ENGINEERING -

Regency Institute of Technology - Pondicherry UN

Board of Intermediate Education M.P.C -

Aditya Public School

Secondary School Certificate -

Aditya Public School
R N DINAKAR PARIMI